Sutter Santa Rosa
Structural Projects
Sutter Medical Center of Santa Rosa
Santa Rosa, CA
Concrete Services was selected as a design-assist Subcontractor on an
Integrated Project Delivery (IPD) team for Sutter Medical’s new
hospital facility in Santa Rosa. The IPD method is based on LEAN
principles for all design and construction of the project. The team
consists of the Owner, Architect, Engineers, Consultants, CM/GC and
select design assist subcontractors. This strategy requires a high
level of collaborative participation by all members involved.
The project, a new 182,329 square foot 2-story replacement hospital,
central utility plant and loading dock with MRI pad, is in the
design phase now with an estimated ground breaking of July, 1, 2011.
The concrete work consists of large grade beam foundations on a
surcharged building pad, with five elevator pits, and slab on metal
decking. The total mass excavation will be over 8,000 cubic yards,
with 7,000 cubic yards of concrete in the foundation, 2,500 in slab
on grade and 3,000 in slab on deck.
We are very excited about joining the Unger Construction team and
look forward to a successful endeavor.
Architect: HGA
General Contractor: Unger Construction