
Cosumnes Oaks High School
Cosumnes Oaks High School
Site Projects
Cosumnes Oaks High School and Elizabeth Pinkerton Middle School
Elk Grove, CA
Site work on this 77 acre site consisted
of 216,000-square-feet of paving, with multi-color stain used at the
Library and Performing Arts Center. Use of the Power Curber 5700
provided us with the highest level of productivity while laying
44,000-linear-feet of curbing.
Architect: Stafford King Wiese Architects
General Contractor: Lathrop Construction
